LAGAN ENERGY (BALLYMENA) LIMITED
PUBLIC NOTICE
APPLICATION FOR ELECTRICITY GENERATING LICENCE,
The following public notice was prepared in accordance with the ‘The Electricity (Applications for Licences and Extensions of Licences) (No. 2) Regulations (Northern Ireland) 2007, Schedule 4 part 1.’
1. Full name of the applicant(s).
Lagan Energy (Ballymena) Limited
2. Address of the applicant(s) or, in the case of a body corporate, the registered or principal office.
Rosemount House, 21-23 Sydenham Road, Belfast, Northern Ireland, BT3 9HA
3. Where the applicant is a company, the full names of the current Directors and the company’s registered number.
LOUGHLIN, Sean James
LAVERY, Sean David
Company Registration Number NI679817
4. Where a holding of 20 per cent, or more of the shares (see Note) of the applicant is held by a body corporate or partnership or an unincorporated association carrying on a trade or business with or without a view to profit, the name(s) and address(es) of the holder(s) of such shares shall be provided.
Lagan Energy Limited, Rosemount House, 21-23 Sydenham Road, Belfast, Northern Ireland, BT3 9HA
5. Desired date from which the licence is to take effect.
01 August 2025
6. The number of generating stations intended to be operated under the license (if granted)
1
7. A sufficient description specifying the actual or proposed locations of those stations, e.g. by reference to townlands, local government districts, postal address, etc.
35 Woodside Road, Ballymena, Co. Antrim, BT42 4QH
8. A description of how those stations will, in each case, be fuelled or driven
5 Peaker Generators. Each generator is 0.998MW giving a total capacity of 4.98MW. The generators are fuelled by HVO.
9. The date when any proposed generating stations are expected to be commissioned
1 August 2025
10. The capacity and type of each unit within the generating station (MW).
The generating station will be composed of 5 Peaker Generators of 0.998MW each giving a total of 4.98MW.
11. A statement of the extent (if any) to which the applicant considers it necessary for powers under Schedule 3 (compulsory acquisition of land etc.) and under Schedule 4 (other powers etc.) to the Order to be given through the licence for which he is applying, together with a statement of specific purposes for which those powers are felt to be necessary.
There is no requirement for Schedule 3 and 4 powers to be invoked.
12. Details of any licences held, applied for, or being applied for by the applicant in respect of the generation, participation in transmission or supply of electricity.
None
A map forms part of the documents and particulars provided for this application, a copy of the map is available for inspection by the public at the principal office of the Authority between 10:00 a.m. and 4:00 p.m. on any working day at this address; Utility Regulator, Queens House, 14 Queen Street, Belfast BT1 6ED.