Search
Advanced search
Back

Town and Country Planning

Notice category:
Planning
Notice type:
Town and Country Planning
Publication date:
Edition:
The London Gazette
Notice ID:
4981871
Notice code:
1601
Issue number:
64878
Page number:
20056

LONDON BOROUGH OF BARNET

STOPPING UP OF HIGHWAY AT/ ADJACENT TO PARKLEY CLOSE AND BROOKLEY CLOSE AT DOUGLAS BADER PARK ESTATE, COLINDALE, NW9 - PHASE 2

(STOPPING UP ORDER NO.2 2025)

NOTICE OF INTENTION TO MAKE A STOPPING UP ORDER SECTION 247 TOWN AND COUNTRY PLANNING ACT 1990

NOTICE is hereby given that the London Borough of Barnet (“the Council”) acting in its capacity as local highway authority proposes to make an Order under section 247 of the Town and Country Planning Act 1990 (as amended) (“the Act”) authorising the stopping up of the highways described in the First Schedule below and shown hatched with bold black diagonal lines on Drawing No. DB2-MHT-XXX-XX-M-C-00900 rev.P03 attached to the Order.

IF THE PROPOSED ORDER IS MADE, the stopping up will enable the redevelopment of land at Douglas Bader Park Estate, Colindale London NW9, as described in the Second Schedule to be carried out in accordance with the planning permission granted by the Council under Part III of the Act on 18 March 2022 under planning reference 20/6277/FUL and any subsequent permissions granted under section 73 of the Act which vary or amend this planning permission which do not affect the area being stopped up and will be for no other purpose.

COPIES OF THE DRAFT ORDER AND RELEVANT PLAN MAY BE INSPECTED free of charge between the hours of 9.00am and 4.30pm Monday to Friday (excluding bank holidays and public holidays) for a period of 28 days commencing on 16 October 2025 from the main reception, London Borough of Barnet, 2 Bristol Avenue, Colindale, London NW9 4EW. Please contact the Council at highway.development@barnet.gov.uk or on 020-8359-3555 to arrange for a copy of the draft Order and relevant plan to be sent. A copy may also be viewed on the Council’s website at www.barnet.gov.uk.

ANY OBJECTION to the making of the proposed Order must be made in writing within a period of 28 days commencing on 16 October 2025 by sending written notice to the Highways Development Control Manager, Highways Service, Customer and Place, London Borough of Barnet, 2 Bristol Avenue, Colindale, London NW9 4EW or by email to highway.development@barnet.gov.uk before 5pm on 13 November 2025.

The Council may disclose the substance of any objection made to the making of the Order to other persons affected by it and that those persons may wish to communicate with the objector. If no objections are duly made to the making of the Order, or if any objections are withdrawn, the Council may make the Order as an unopposed Order. Any objections duly made and which are not withdrawn will be referred to the Mayor of London.

THIS NOTICE is given by virtue of Section 252 of the above Act.

FIRST SCHEDULE

DESCRIPTION OF HIGHWAYS TO BE STOPPED UP

THE HIGHWAY AREAS AND SECTIONS LISTED BELOW ARE SHOWN ON “HIGHWAY STOPPING UP DRAWING NO DB2-MHT-XXX-XX-M-C-00900 REV.P03”. THE DIMENSIONS QUOTED BELOW ARE APPROXIMATE AVERAGES AND HAVE BEEN ROUNDED TO THE NEAREST HALF METRE. THE DRAWINGS SHOULD BE REFERRED TO FOR EXACT LOCATIONS

NAME OF HIGHWAY

ADDRESS OF HIGHWAY

GRID REFERENCE AREA BOUND BY THE FOLLOWING AREA DEMARCATION POINTS (SEE TABLE A BELOW FOR COORDINATES)

WIDTH OF EXISTING HIGHWAY

LENGTH OF EXISTING HIGHWAY

AREA D

BROOKLEA CLOSE AREA=1144.5

EXISTING CARRIAGEWAY AND FOOTWAY, FROM JUNCTION WITH CLAYTON FIELD WEST TO INCLUDE PARKING COURT

1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11,

12, 13, 14, 15, 16, 17, 18, 19, 20, 44, 45, 46, 47, 48, 49, 50,

51, 52, 53, 54, 55, 56, 57, 58, 59, 60, 61, 62, 63, 64

6.1m CWAY 92.5m

AREA E

PARLEA CLOSE AREA=778.9

EXISTING CARRIAGEWAY AND FOOTWAY, FROM JUNCTION WITH CLAYTON FIELD WEST

21, 22, 23, 24, 25, 26, 27, 28,

29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42

6.2m CWAY 92.8m
TABLE A (1/4) - GRID REFERENCE LIST OF AREA DEMARCATION POINTS

NO

EASTING

NORTHING

NO

EASTING

NORTHING

1 521328.3898 190909.0902 33521347.4717 190851.4086
2 521332.4758 190906.1826 34521347.3753 190845.2442
3 521342.3790190906.127435521340.8430190859.3000
4 521342.9523190904.289036521335.0052190859.3430
5 521342.9418 190903.387037521334.9847190851.0318
6 521343.7578 190903.387038521330.3808190851.0560
7 521343.9282 190910.808839521330.3193190841.3966
8 521344.5782 190912.685440 521334.9304 190841.3776
9 521348.5476 190913.738441 521334.8938 190837.8055
10 521350.9640 190913.619942 521340.7441 190837.7455
11 521356.9485 190913.677544 521412.6113 190929.2337
12 521360.9010 190913.684145 521385.6580 190929.4613
13 521366.4968 190914.215746521383.4448 190929.1147
14 521371.7998 190913.421147 521382.9781 190929.9094
15 521380.5128 190916.749948 521381.1320 190929.8126
16 521378.5576 190921.167049 521381.1486 190931.4491
17 521386.9083 190923.337050 521379.2866 190933.0533
18 521413.6750 190923.137951 521377.3611 190932.8771
19 521422.7573 190912.892952 521372.1470 190932.9424
20 521423.0726 190939.674453 521372.0939 190926.9485
21 521422.2766 190868.647954 521369.2105 190926.1642
22 521421.8918 190840.610555 521362.3631 190923.8504
23 521411.3879 190852.613656 521349.9476 190923.9049
24 521411.3580 190858.708657 521344.2681 190928.8378
25 521392.9407 190858.955158 521344.2960 190931.5861
26 521392.5839 190852.841359 521341.2020 190931.6083
27 521379.3437 190857.967960 521333.9592 190929.6649
28 521377.5347 190850.990661 521332.1381 190927.9907
29 521379.4359 190846.369362 521326.1339 190928.0610
30 521373.2852 190843.745163 521326.0663 190922.2894
31 521371.2918 190848.343164 521328.5902 190922.2598
32 521368.9398 190853.8823

SECOND SCHEDULE

DESCRIPTION OF DEVELOPMENT

Comprehensive redevelopment of the site comprising demolition of the existing buildings and re-provision of up to 753 residential dwellings (Use Class C3) in buildings of up to 9 storeys with associated car and cycle parking public and private open spaces ancillary structures, and all other necessary enabling works, roads and services.

Dated this 16th October 2025

Ian Edser,

Director of Highways and Transportation, Environment Directorate,

On behalf of the London Borough of Barnet